Short answer: In our bathroom contracts, a heated floor shows up as one line in the optional add-ons list, and the line is short. It says “Heated flooring installation” and stops there. It does not say what kind of heating, where the control goes, or what the floor will sit on top of. That is fine for a price list.…
Short answer: Many of our contracts say trash removal is included, in a handful of set phrases. Far fewer say anything about dust, protecting the rest of your home, or cleaning up. That does not mean it does not happen. It means that if it matters to you, you should ask for it in writing before demolition day. Trash: the…
Short answer: Nobody can see everything inside a bathroom wall before it is opened. A contract can handle what turns up in three ways: put the repair in the scope, say it will be quoted separately, or say nothing at all. Our contracts do all three, so read this part of yours before you sign, and ask what happens when…
Short answer: The last stage of a bathroom remodel is a run of small jobs: set the vanity and the toilet, mount the mirror and hardware, put in baseboards, paint, clean up and walk the room together. They are small, but they are the part you see and touch every day. Before the work starts, read the end of your…
Short answer: In many of our bathroom contracts, the Tiling line covers the shower: wall tile and floor tile in the shower area, then grout. The tile for the rest of the bathroom floor is often on a different line, Flooring, though some contracts write the floor into the Tiling line instead. Neither line says how high the wall tile…
Short answer: In Massachusetts, two different things get called “licensed”: a home improvement contractor (HIC) registration under M.G.L. chapter 142A, and a construction supervisor license (CSL) under 780 CMR 110.R5. Insurance is a third, separate question. A contractor can have one and not the others. If the person you hire has no HIC registration, the law’s safety nets for owners…
Short answer: A window near the tub or shower is easiest to plan while the walls are open. Before the walls close, settle four things: how the opening is waterproofed, what the window sits above, what kind of glass it gets, and how the outside wall is repaired. Below are the window setups we have written into contracts or photographed…
Short answer: In the two basement contracts we read for this article, the price covers the carpentry and finish work: framing, drywall, flooring, doors, trim and paint. Both leave out the materials and the electrical work. One also leaves out plumbing, and one leaves out insulation. Before you sign, ask what is not in the price, who does it, and…
Short answer: In the seven bathroom remodel contracts we read for this article, payments are tied to stages of the work, not to calendar dates. Six of the seven start with a deposit at signing; the next payment is due the day work starts, and the last one is due after the work is finished and you approve it. In…